Concept draftVicTrack Rail Interface Guidelines
VicTrack Rail Interface Guidelines Concept draft

For anyone developing next to rail in Victoria

Rail Interface Guidelines

Find the requirement for your site. See why it exists. Know what to do next.

Start
  1. 1Read why it matters
  2. 2Choose a section
  3. 3Follow the steps
Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

Home/Guidelines

Where would you like to start?

Pick the part that matches your project. Each one shows your site on a drawing, tells you what you need to do and why, and walks you through it step by step.

New to rail? Start with Rail 101Who's who, what's in a rail corridor and the words you'll hear. Why it mattersWhat can go wrong next to the tracks, with the numbers behind it.

The Guidelines

This concept builds Site and building in full. Every other section would follow the same pattern: a drawing of your site, what you need to do and why, a step-by-step guide and a real example.

Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

Home/Guidelines/Stormwater and drainage/Case study

Worked example · case study · illustrative

Stormwater connected to a rail culvert

Start with what went wrong on one site. The requirements and a step-by-step guide follow.

Illustration from this concept. A site photo from the VicTrack library would go here.
    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/Guidelines/Site and building

    Site and building

    Start with stormwater and drainage, the worked example. Then select any numbered label, or any part of the drawing, to see what you must do.

    Start here · worked exampleStormwater and drainageSee what went wrong on one site. Then read the requirements and follow the steps.Open the case study

    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/Introduction

    IntroductionBefore you start

    Building next to the railway

    More homes, shops and offices are going up beside Victoria's train lines. These Guidelines explain what the railway needs from your project, and why.

    The State has planned for more than 300,000 new homes near train and tram lines by 2051.1 For many owners and designers, the railway will be a new kind of neighbour. It runs day and night, its overhead wires carry 1,500 volts, and it relies on three things: dry ground under the track, a clear view of the signals, and a boundary nobody can wander through.

    Most rail issues are set in the first weeks of design, which is also when they are cheapest to fix. Each section of these Guidelines shows the rule, the reason for it, and the steps to follow.

    1. Pick the section that matches your project.
    2. Point at your site to see the rule and why it applies.
    3. Follow the steps and talk to VicTrack before you lodge.
    • 300,000+new homes planned near train and tram lines by 20511
    • 14football fields: how far a train can need to stop2
    • ~3,000trespass incidents on Melbourne's network in 20233
    • $314myearly cost of incidents involving people on the network4

    Where projects next to rail most often go wrong

    Sources: 1 DTP, Train and Tram Zone Activity Centres · 2 TrackSAFE and ARA, Rail Safety Week 2023 · 3 Premier of Victoria, June 2024 · 4 TrackSAFE, economic impact FY23

    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/Introduction/Rail 101

    Rail 101Page 1 of 2 · The basics

    Rail 101: the basics

    The people, words and habits you'll meet when you build next to the railway.

    Who's who

    VicTrack, DTP and the rail operatorsEach agency has a different role. See who does what, and who to contact, on the Who's who page.Open Who's who

    Key words

    Rail corridor
    The fenced strip of railway land the tracks run through. Off limits without permission.
    Track centreline
    The line midway between the rails. Setbacks are measured from here, not the fence.
    Danger zone
    Within 3 m of the track. No one works here without rail approval.
    Overhead wires
    Power for electric trains. Cranes and scaffolds must stay well clear.
    Signal sighting
    Making sure drivers can see each signal. Nearby signs and lights are checked.
    Culvert
    A pipe under the track for the railway's water. Not a drain for your site.
    Legal point of discharge
    Where council says your stormwater must go, usually the street.
    Pre-application meeting
    An early talk with VicTrack, before you lodge, while changes are easy.

    Five habits near the tracks

    • Stay on your sideNever enter the corridor without permission.
    • Look upKnow where the wires are before you lift anything.
    • Expect a trainAny time, either direction, any track.
    • Keep it secureFence closed, nothing loose to blow onto the line.
    • Speak up earlyCall VicTrack. In an emergency, call 000.
    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/Rail 101/Inside a rail corridor

    Rail 101Page 2 of 2 · The corridor

    Inside a rail corridor

    A slice through a typical corridor, from your site to the far side of the track. Select a number to see what each part is.

    Your site 1.8 m fence Danger zone Track centreline 1,500 volts Setback, measured to the track centreline Railway land 1 2 3 4 5 6 7 8 9
    Not to scale. Draft dimensions and technical statements are illustrative and require source verification and VicTrack approval before publication.
    1. 1Your siteYours to build, clean and repair, from your own land.
    2. 2Boundary fenceAt least 1.8 m, fully on your land, kept by you.
    3. 3Railway landNot for access, scaffolding, drains or anchors.
    4. 4BallastCrushed rock that holds the track. Must stay dry.
    5. 5Track centrelineWhere your setback is measured from.
    6. 6Danger zoneWithin 3 m of the track. Rail approval only.
    7. 7Overhead wires1,500 volts. Keep 4.6 m to the side, 6.4 m below.
    8. 8SignalMust stay clearly visible to the driver.
    9. 9CulvertCarries the railway's water. Not your outlet.
    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/Who's who

    Who's whoRoles and responsibilities

    Who does what

    Several agencies look after Victoria's railways. Each has a different role, so it helps to know who to contact and when. Start with VicTrack: it owns the land and can tell you who else needs to be involved.

    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy

    Home/FAQs

    FAQsCommon questions

    Frequently asked questions

    Answers to the questions VicTrack is asked most often. Select a question to see the answer.

    Q1I am going to build a development next to rail. Who do I speak to?Before you start

    There may be several agencies with an interest. VicTrack has an interest in every planning application next to rail because it owns the railway land. You can contact the VicTrack Planning team at customer.service@victrack.com.au. VicTrack can tell you which other stakeholders may have an interest, including the rail operator and the Department of Transport and Planning.

    Q2What information do I need to provide?Before you start

    A site location or address, and plans. In the early stages, before design has started, VicTrack can give some advice with just the site location.

    Q3I am demolishing and excavating before the planning stage. Do I need to talk to rail stakeholders?Construction

    Yes. Demolishing some structures, especially large buildings, can create risks for the railway. For example, a wall could collapse, debris could fall onto the track, or a crane could swing into the rail corridor and hit overhead electrical equipment. Excavation can also create risks, especially if it could destabilise an embankment or the formation that supports the track. For these reasons, demolition and excavation, especially on large sites, usually needs a Construction Management Plan prepared in consultation with the rail operator and VicTrack.

    Q4I haven’t lodged my planning application yet. When should I speak to the rail agencies?Before you lodge

    As early as possible. It is far easier to make the rail interface safe if rail interface principles are built into the design from the start.

    Can't find your question? Contact the VicTrack Planning team at customer.service@victrack.com.au.

    Concept prepared by Opposite · Human Factors SpecialistsDemonstration only · not approved VicTrack policy